37 Khojaly avenue, Demirchi Tower, 15th floor, Baku, Azerbaijan AZ1025
info@innopro.az
(012) 310 34 88
AZ
RU
EN
Home
Who we are?
Partners
Services
Projects
Axtar
Bridges & tunnels
Railway tunnel at Km 70+306 of Horadiz-Aghband railway
The longest railway bridge in Azerbaijan
Designing of the highway tunnel on the Islam Abishov Street, Narimanov district
Gallery
Designing to strengthen the river Zayamchay banks on the 427th km of the Baku-Alyat-State border of Georgia
The longest railway tunnel in Azerbaijan
Rectangular culvert 4*2.5 pipe for the Socar GPC - Garadag station railway
Culvert round 1.5 pipe for the railway of Garadagh station
Designing a railway bridge for the railway from the Garadagh station to the Complex of Gas Processing Plant, Steam Cracker Unit and Polyethylene Plant
Designing of the railway bridge in 125.114 km of the Baku-Boyuk Kesik railway
Design of an underground pedestrian crossing on KM5 PC7 Narimanov-Boyuk Shor, Baku
Bridge over the Hekari river
Railway bridge
Railway tunnel at Km 104+270 section of Horadiz-Aghband railway
Engineering facilities on the Horadiz-Agband railway
Engineering facilities on the Barda-Aghdam railway