Designing of the Zira Port railway line
Project name: Zira Port
Customer: “DƏMİRYOLSERVİS” LLC
Project duration: 05.2020 - 08.2020
Project scope:
The total length of the railway is L=12.03 km. Within the project there were designed 6 culverts with the d=1.25 m and intersection of the 2 railroads and highway at the same level.