Designing of the Horadiz-Aghband railway, 110 km
Project name: Designing of the Horadiz-Aghband railway,110 km
Customer: CJSC Azerbaijan Railways
Project duration: 05.2021 - 10.2025
Project scope:
- The length of the railway along the axis is 110.4 km; if includes the side roads - 140.6 km in total
- 8 stations
- 3 tunnels
- 47 bridges
- 5 routers
- 7 car underpasses
- Galleries and retaining walls of various sizes
- Artificial engineering installation: (4 animal crossings, 253 culverts, 2 dukers, 222 p.m stone wall, 315 p.m geogrid wall and 152 reserve passages)
- 110.4 km of electricity supply, communication and signaling systems have been designed.
Within this project, first time ever, were designed the longest railway bridge in Azerbaijan with a length of 771 m and a tunnel with a length of 1072 m